Tuesday, August 23, 2011

Vacuum Sewers

We presented at the 2011 Conference on Coastal Engineering Practice on August 22, 2011.  This conference is hosted by COPRI (Coasts, Oceans, Ports, and Rivers) Institute of ASCE (American Society of Civil Engineers).

The topic of our presentation was 'Vacuum Sewers – A Viable Alternative for Coastal Areas' and is presented below. Should you want a copy of the paper, please send us an email and we will provide you with a copy of the  paper.


We have several lessons learned on vacuum sewer projects and will be very glad to share it with anyone looking to install a vacuum sewer system. Please feel free to contact us.

Sunday, April 10, 2011

Traditional Engineering - Half Yearly Report

Proteus can expertly perform any projects in the water-wastewater arena from project inception to final completion and handover. We are proficient in Feasibility Reports, Alternatives Development & Evaluation,  Preliminary Design, Project Implementation Plans, Construction Plans, Specifications, and Estimates, Budget and Schedule Management, Bid Phase Assistance, Shop Drawing Submittal Review, Field Engineering, Construction Inspection, Contract Administration & Scheduling. Apart from that we also offer Quality Management Programs and Technical Evaluation and Support.

In the last six months (October 2010 through March 2011) we have worked on the following projects:
  • Aquifer Study and Preliminary Design at MCAGCC, 29 Palms, CA. Proteus Consulting had teamed with Rore Inc. to conduct a hydrogeological/aquifer study and engineering feasibility study for potable water supply at the Marine Corps Air Ground Combat Center at 29 Palms, CA. The project included a detailed review of the aquifer and groundwater well field design, demarcation of the aquifer boundaries and water quality profile, followed by preliminary design of water storage, blending facility/treatment, and water delivery infrastructure. Proteus Consulting evaluated feasible blending alternatives from varied groundwater sources to meet potable water quality objectives. This involved the conceptual design of water storage tanks, including number, size, and location, mechanical blending process configurations, and treatment options.
  • Wastewater Treatment Alternative Study, SERE Camp, San Diego, CA. Proteus Consulting has teamed with Thomas/Wright, Inc. to conduct a preliminary engineering study for the wastewater treatment options at the Survival, Evasion, Resistance, and Escape (SERE) training facility at the U.S. Navy's Training Site in Warner Springs, CA located in the Cleveland National Forest. It is in a remote area near the community of Warner Springs in the northeastern San Diego County, at an elevation of about 3,200 feet. The Camp consists of a headquarters area with an administrative building, several staff barracks building, a wastewater treatment plant, and a training compound. All west coast Navy/Marine Corps personnel who risk capture during wartime (e.g. aviators) undergo SERE training at this facility. The Warner Springs SERE Facility covers 6,100 acres and trains over 1,500 students each year. The project includes a detailed review of the existing treatment plant, followed by preliminary design of proposed new facilities/ upgrades. Proteus Consulting will evaluate feasible alternatives to ensure that the new plant will consistently meet the NPDES permit.
  • Mt. Israel Pipeline Replacement, Olivenhain Municipal Water District, Carlsbad, CA. Proteus Consulting is contracted by OMWD for a project to design the replacement of an 8-inch potable water pipeline on Mt. Israel Road. The key elements include location of the main in County road and right-of-way, easement analysis, design of pipeline in rock, traffic issues, and community assurance. 
  • Rancho La Cima/Aliso Canyon Pipeline Relocation, Olivenhain Municipal Water District, Carlsbad, CA. Proteus Consulting is contracted by OMWD for a project to design the relocation of an 8-inch PVC water pipeline at the intersection of Aliso Canyon Road and Rancho La Cima. This relocation is necessary due to a conflict with the proposed new 60-inch County storm water pipeline along Aliso Canyon Road. The intent of this project is to lower the current water main to clear the proposed storm drain.